Healthcare fit-outs delivered without compromise.

Hospitals, clinics and healthcare environments where compliance, hygiene and minimal disruption are non-negotiable. The work has to be right first time.

Right first time.
Every time.

Healthcare environments have no tolerance for error. Installations must comply with strict specifications, meet hygiene standards and be delivered with minimal disruption to patients, staff and visitors.

We plan everything before site access begins. Manufacturing is completed and quality-checked at Honley. On site, works are sequenced carefully around operational requirements. We have never missed a deadline.

Costa Coffee
Group

Everything your bar or
restaurant needs.

We manage every detail of your interior, from the first drawing through to final snagging. Here’s what that covers.

01

Ceilings, Flooring & Finishes

New ceilings, flooring and decorative finishes across wards, corridors and clinical areas. All specified and installed to hospital standards.

02

Hygienic Wall Cladding

Specialist hygienic cladding systems for clinical environments. Durable, cleanable and compliant with current healthcare specifications.

03

Fire Doors & Compliance

Fire door installation to current building regulations. Signed off and compliant before handover. No shortcuts.

04

Kitchen Refurbishment

Full kitchen refurbishment including bespoke cabinetry manufactured in-house. Built to withstand a commercial healthcare kitchen environment.

05

Bespoke Clinical Joinery

Reception desks, nurses stations, storage cabinetry and clinical furniture. All manufactured at our Honley facility to the client’s specification.

06

Minimal Disruption Delivery

All works planned and sequenced to minimise disruption. Access windows coordinated with hospital facilities teams throughout.

Healthcare

CaseStudy Glenfield3
Leicester
Glenfield Hospital
Comprehensive refurbishment at a Leicester hospital, delivering bespoke joinery, specialist finishes and essential upgrades.
York Costa
North Yorkshire
Costa Coffee: Leading North Yorkshire Hospital
Transforming a hospital-based Costa Coffee into a modern 'Store of the Future'.

How we work
Planned, sequenced,
delivered right.

01

Programme Planning

We plan every access window in advance with the hospital’s facilities team. Manufacturing is completed and quality-checked at Honley before site access begins. Nothing is left to chance on site.

02

Compliant Installation

All works delivered to hospital specification and current building regulations. H&S and CDM compliance managed throughout. One Contract Manager coordinating every trade.

03

Handover & Sign-Off

Rigorous snagging before handover. All installations signed off to specification. We don’t hand over until everything is right and we don’t create problems for the environments we work in.