When a project is moving quickly, that communication matters.
Material selection, construction methods and detailing need to reflect the demands that will be placed on the finished environment. In hospitality and public-facing spaces in particular, surfaces and joinery can be exposed to significant daily use.
Considering durability alongside appearance helps create interiors that continue to perform once the project team has left site.
Deanhouse's work at the Royal Academy of Arts in London demonstrates how these considerations come together on a complex project.
Working alongside 442 Design, Deanhouse supported the refurbishment of the RA Café, Sir Hugh Casson Room and Belle Shenkman Room, with the aim of improving customer flow, service efficiency and operational flexibility while respecting the character of the building.
The Royal Academy is housed within a Grade II listed building, with historic murals more than 100 years old requiring specialist conservation oversight and protective measures throughout the works. The venue also remained live, while other contractors were completing external façade works.
Site deliveries were restricted to between 7am and 9:30am, with larger elements of the installation planned around Monday closures.
Close coordination between design, manufacture and site delivery was therefore essential. Deanhouse provided practical input around materials, construction and manufacturing before producing bespoke service counters, hospitality joinery and seating.
Functionality also influenced some of the less visible details. HVAC systems beneath seating required ventilation routes and grilles to be incorporated discreetly, while specialist lighting had to be positioned to enhance the historic murals without compromising their protection.
Where existing elements could be retained, the team also looked beyond replacement. 68 chairs were stripped and recoated, 30 table bases were prepared and powder coated, and 20 oak table tops were re-sanded and re-stained.
The result was an updated hospitality environment designed around how the Royal Academy needed its spaces to operate, completed ahead of the 2026 Summer Exhibition.